The approach to managing stormwater has not kept pace with the digitally enabled environment. Adaptable infrastructure with Opti changes what was once thought of as a liability into an asset.
The iPond is an intelligent stormwater management project, developed in response to a persistent problem of roadway flooding and property damage in Beckley, WV.
Albany Water Board, CHA, and OptiRTC are awarded Project of the Year by the New York Capital Branch of APWA for their project "Beaver Creek CSO Abatement"
Capital Region Watershed District and OptiRTC are awarded Project of the Year from the Minnesota Association of Watershed District for their project "Upper Villa Park"
CMAC was deployed at three stormwater management facilities within the Anacostia River watershed to convert passive systems to dynamically controlled systems and monitor performance of each site for a year.
Villanova University has teamed up with OptiRTC to design and retrofit existing green infrastructure systems at Villanova University with real-time control technology to evaluate system performance and investigate the role of automated, self-learning controls within traditional GI design.